Residential and housebuilding site surveys with turnaround measured in days
Survey Solutions delivers survey turnaround measured in days, so your pipeline keeps moving. The government’s 1.5 million homes target is sustaining pressure on housing delivery, and developers, housebuilders and architects need topographic, utility, drainage and setting-out survey on site quickly, to the same standard in every region. As a general rule we aim to be on site within one week, working from 16 offices, and we have delivered at Embassy Village, York Central and Bellevue Mansions.
Topographic survey on site within one week
Speed is the claim a residential buyer tests first, so we will be plain about it: as a general rule we aim to be on site within one week, which is what keeps a planning submission, a land deal or a build programme on track. Embassy Village, York Central and Bellevue Mansions were all delivered to that pipeline pace.
The same survey standard in every UK region
We work from sixteen offices across the UK, so a national housebuilder gets the same standard, the same formats and the same turnaround on a site in Manchester as on one in Bristol. Using one supplier across the pipeline takes the regional variation out of your survey data.
Topographic, utility, drainage and setting out from one supplier
Topographic, utility, drainage and setting out all come from one supplier, which takes the coordination off your technical coordinator’s desk, because the survey that supported the planning submission then becomes the control network your site team sets out from.
Trusted Surveying Partner to UK Housebuilders
Housebuilding moves fast. You need a survey team that can keep up. Here’s what we offer:
- CSCS-carded surveyors who know housing sites.
- BIM-compatible data that drops straight into your design workflow.
- Fixed-fee pricing
- Experience with Tier 1 developers and regional housebuilders.
- Accredited to ISO 9001, ISO 45001 and ISO 27001, plus CHAS and Constructionline.
Supporting Planning, Design and Delivery for Housebuilders and their Projects
Whether you’re preparing planning submissions, designing infrastructure, or progressing to build, our surveys ensure that you start with accurate data and maintain full visibility throughout the construction phase.
We support:
- Site viability and feasibility assessments
- Planning application requirements
- Design coordination and clash avoidance
- Construction monitoring and stakeholder assurance
- Handover documentation and asset records
Our Latest Housebuilding Projects
Housebuilding FAQ’s
Surveying and monitoring services to support residential development—providing accurate, fast and reliable surveys nationwide.
As early as possible (site acquisition/planning stage) so design decisions and planning submissions are based on accurate site conditions.
Yes, underground utility surveys help reduce risk during groundworks and service installations.
Yes, site engineering can support build-out phases where precise set-out and as-built verification are required.
York Central and Embassy Village are the proof, and as a general rule we aim to be on site within one week, so ask us for the turnaround detail on your own site.
Site location, development size/phasing, which surveys you need (topo/utilities/buildings/setting out), outputs, and programme deadlines.