Natural Environment
Reservoir and Natural Environment Surveying and Monitoring
Survey Solutions provides Reservoirs Act monitoring and environmental compliance surveys for reservoir owners, regulators and their contractors. Every year we survey eleven reservoir sites for the Environment Agency, working through Breheny.
Statutory duties come round every year. So the data has to be collected the same way, to the same standard, every time. That is what lets an engineer compare this year with last year and spot real change.
Reservoirs Act monitoring for the Environment Agency
Under the Reservoirs Act, large raised reservoirs must be supervised and regularly inspected by qualified panel engineers. Those engineers need reliable survey data on the dam, embankments and surrounding ground.
Our annual programme covers eleven Environment Agency reservoir sites, including sites across the West Midlands and Staffordshire.
Why repeatable data matters
A single survey shows how a reservoir looks today. Repeat surveys show how it is changing. That only works when each visit uses the same control, the same points and the same method.
- Same method, every year: We keep the control network and survey points consistent.
- Clear comparisons: Results are reported against previous years, so movement stands out.
- Audit-ready records: A clean trail of data the panel engineer and regulator can trust.
- Planned around the site: We work around water levels, public access and wildlife.
Environmental Monitoring
An annual, renewed relationship is what this sector is, so it is monitoring by nature, as with the West Midlands reservoirs we survey for the Environment Agency.
Environmental monitoring on the River Nene and River Trent
Our environmental monitoring also covers major rivers. We have worked on the River Nene for Jackson Civil Engineering and surveyed weirs on the River Trent. Rivers with statutory duties need the same consistent approach as reservoirs.
Need design data for a river or canal scheme instead? See our river, canal and coastal surveys.
Natural Environment FAQ’s
It is ongoing. We survey eleven reservoir sites for the Environment Agency every year, not once. Annual monitoring builds a reliable record over time, which is what statutory compliance needs.
It measures the position and level of points on the dam, embankments and nearby ground. Comparing each year’s results shows settlement or movement early. The panel engineer then uses the data in their supervision and inspection reports.
Yes. Our Environment Agency reservoir work is delivered through Breheny, and our River Nene work was for Jackson Civil Engineering. We are used to working inside framework contracts and to the client’s reporting standards.