Nuclear construction survey, working to your control network
Survey Solutions provides nuclear construction surveys inside live nuclear new build, working to your control network and programme milestones. We’ve delivered at Sizewell C. We’ve been an NSAN member since 2023, our team is security-cleared, and we handle data to ISO 27001.
On a nuclear programme, survey can’t run as a separate exercise. Control points, possessions and milestones are set by the contractor. So we fit our work into your setting-out and your programme, not the other way round.
Surveys across the wider site
A nuclear build is surrounded by campuses, batching plants and support areas, each with its own access rules. At Sizewell C, our work has covered the MAR site, the campus, the concrete batching plant, and Sizewell A and B.
The contractor is the buyer, not the licensee
We are engaged by the contractors delivering the programme, so our work fits their setting-out and their possession instead of becoming a separate survey exercise. In practice that means working to the site agent’s, the setting-out engineer’s and the project manager’s programme inside a Tier 1 or specialist contractor, because they are the team actually running the job day to day.
Security, standards and data
- NSAN member since 2023
- Security-cleared survey team
- ISO 27001 data handling for sensitive site information
- ISO 9001 and ISO 45001 for quality and safety
- Work delivered to programme standards and access rules in a live nuclear new build
Proven at Sizewell C
We’ve worked for six separate organisations at Sizewell C. Our scope has covered control points, the MAR site, the campus, the concrete batching plant, and Sizewell A and B. All of it was delivered inside a live nuclear new build, to the programme’s standards and access rules.
Structural Monitoring
Survey is only the start, because we also monitor structures and assets across multi-year programmes, holding to the same data standards throughout.
Nuclear FAQ’s
Yes. Our nuclear team is security-cleared, and we handle all site data to ISO 27001. We’ve also been a member of NSAN (the National Skills Academy for Nuclear) since 2023, and we work to each programme’s own standards and access rules.
The contractor buys it, which is why at Sizewell C we work to the site agent, the setting-out engineer and the project manager inside a Tier 1 or specialist contractor instead of to the licensee directly.
Yes. That’s how we work on every nuclear job. Our survey ties into your control network and fits your possessions and milestones. It’s part of your programme, not a separate exercise that you have to manage around.
Send us the site area and scope, your control network details and the outputs you need. Add access and security requirements and your programme milestones. With this, we can plan resources with the right clearances and give you an accurate price.